Activity 1 - Strip and Pad footingYou are required to estimate the cost to pour the Strip and Pad footing shown on the attached plans and produce a list of materials-
Step 1Provide a list of the quantity and type of materials needed-
Step 2Using the rates provided by your trainer cost the strip and pad footing
Activity 2 -Strip footingYou are required to estimate the cost to excavate and pour the strip footing shown on the attached plans and produce a list of materials-
Step 1Provide a list of the quantity and type of materials needed-
Step 2Using the rates provided by your trainer cost the strip and pad footing
Activity 3 -Slab on GroundYou are required to estimate the cost to excavate and pour the raft slab shown on the attached plans and produce a list of materials-
Step 1Provide a list of the quantity and type of materials needed-
Step 2Using the rates provided by your trainer cost the raft slab-
Activity 4 - Slab on GroundYou are required to estimate the cost to excavate and pour the raft slab shown on the on the attached plans and produce a list of materials-
Step 1Provide a list of the quantity and type of materials needed-
Step 2Using the rates provided by your trainer cost the raft slab-